Bert Bielefeld 
Basics Construction Scheduling [PDF ebook] 

Apoio

In a world of tight time frames and highly interdependent processes, scheduling is an indispensable prerequisite for successful project implementation. It is the duty of the architect to manage all the project participants in a goal-oriented manner and to call for their results when the time is right. For this reason, a systematic schedule of target dates, adapted to a project’s sequences and workflows, is a necessary tool for the day-to-day management and monitoring of complex construction projects.
Topics:


  • Organizing the planning and construction process

  • The basics of scheduling

  • Goal-oriented presentation formats and levels of detail

  • Developing a schedule

  • Using schedules in the real world

€19.35
Métodos de Pagamento
Compre este e-book e ganhe mais 1 GRÁTIS!
Formato PDF ● Páginas 83 ● ISBN 9783035613049 ● Editora Birkhauser ● Publicado 2017 ● Carregável 3 vezes ● Moeda EUR ● ID 6965667 ● Proteção contra cópia Adobe DRM
Requer um leitor de ebook capaz de DRM

Mais ebooks do mesmo autor(es) / Editor

20.518 Ebooks nesta categoria