CIGB ICOLD 
Cutoffs for Dams [PDF ebook] 

الدعم

ICOLD Bulletin 150, Cutoffs for Dams, discusses foundation treatment methods using cutoff-type barriers. High emphasis is given to alluvial deposits throughout this document; however, different materials may require cutoff. The construction of cutoffs has made significant advances mainly through the development of more powerful machinery for drilling and excavation, but also through the introduction of new concepts and techniques, such as jet grouting and deep soil mixing. The following types of cutoffs are presented in this Bulletin:

– Diaphragm walls
– Vib walls
– Pile walls
– Superimposed concreted galleries
– Jet grouting
– Deep mixing

These methods are described, and the practical application of each method is illustrated by selected case histories. These case histories also demonstrate how certain difficulties specific to a particular dam site have been dealt with. The performance of cutoffs should be monitored so that their efficiency in reducing flow and piezometric head can be evaluated. Piezometers installed in the foundation upstream and downstream of the cutoff are needed to meet this objective.

€124.51
طرق الدفع
قم بشراء هذا الكتاب الإلكتروني واحصل على كتاب آخر مجانًا!
شكل PDF ● صفحات 288 ● ISBN 9781351035972 ● محرر CIGB ICOLD ● الناشر CRC Press ● نشرت 2018 ● للتحميل 3 مرات ● دقة EUR ● هوية شخصية 6784979 ● حماية النسخ Adobe DRM
يتطلب قارئ الكتاب الاليكتروني قادرة DRM

المزيد من الكتب الإلكترونية من نفس المؤلف (المؤلفين) / محرر

11٬229 كتب إلكترونية في هذه الفئة