Eva Kushner & Jean O’Grady 
Critical Path and Other Writings on Critical Theory, 1963-1975 [EPUB ebook] 

Soporte

This volume, which collects Northrop Frye’s writings on the theory of literary criticism from the middle period of his career, includes one of Frye’s own favourites, The Critical Path (1971). A highly important marker of Frye’s career, The Critical Path openly addresses topics that he had previously been reluctant to discuss as fully, including the importance of literature to society, the responsibilities of critics, and the deeper rationales for studying literature.Filled with insightful texts that indicate his transition from literary critic to a theorist of language, myth, and human culture, this edition helps to illuminate many of the ideas and arguments that would appear later in The Great Code and Words with Power. Accompanied by the rigorous scholarship for which the series is renowned, this is another valuable contribution to literary criticism and theory.

€113.42
Métodos de pago
¡Compre este libro electrónico y obtenga 1 más GRATIS!
Idioma Inglés ● Formato EPUB ● Páginas 496 ● ISBN 9781442692183 ● Editor Eva Kushner & Jean O’Grady ● Editorial University of Toronto Press, Scholarly Publishing Division ● Publicado 2009 ● Descargable 3 veces ● Divisa EUR ● ID 6571837 ● Protección de copia Adobe DRM
Requiere lector de ebook con capacidad DRM

Más ebooks del mismo autor / Editor

67.668 Ebooks en esta categoría