Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant: Interim Report evaluates the general viability of the U.S. Department of Energy’s National Nuclear Security Administration’s (DOE-NNSA’s) conceptual plans for disposing of 34 metric tons (MT) of surplus plutonium in the Waste Isolation Pilot Plant (WIPP), a deep geologic repository near Carlsbad, New Mexico. This report evaluates DOE-NNSA’s plans to ship, receive, and emplace surplus plutonium in WIPP and its understanding of the impacts of these plans on WIPP and WIPP-bound waste streams. This report, the first of two to be issued during this study, provides a preliminary assessment of the general viability of DOE-NNSA’s conceptual plans, focusing on some of the barriers to their implementation.
Committee on Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant & Division on Earth and Life Studies
Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant [PDF ebook]
Interim Report
Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant [PDF ebook]
Interim Report
Köp den här e-boken och få 1 till GRATIS!
Språk Engelska ● Formatera PDF ● Sidor 66 ● ISBN 9780309485012 ● Utgivare National Academies Press ● Publicerad 2018 ● Nedladdningsbara 3 gånger ● Valuta EUR ● ID 7145709 ● Kopieringsskydd Adobe DRM
Kräver en DRM-kapabel e-läsare