Bert Bielefeld 
Basics Construction Scheduling [PDF ebook] 

Ondersteuning

In a world of tight time frames and highly interdependent processes, scheduling is an indispensable prerequisite for successful project implementation. It is the duty of the architect to manage all the project participants in a goal-oriented manner and to call for their results when the time is right. For this reason, a systematic schedule of target dates, adapted to a project’s sequences and workflows, is a necessary tool for the day-to-day management and monitoring of complex construction projects.
Topics:


  • Organizing the planning and construction process

  • The basics of scheduling

  • Goal-oriented presentation formats and levels of detail

  • Developing a schedule

  • Using schedules in the real world

€19.35
Betalingsmethoden
Koop dit e-boek en ontvang er nog 1 GRATIS!
Formaat PDF ● Pagina’s 83 ● ISBN 9783035613049 ● Uitgeverij Birkhauser ● Gepubliceerd 2017 ● Downloadbare 3 keer ● Valuta EUR ● ID 6965667 ● Kopieerbeveiliging Adobe DRM
Vereist een DRM-compatibele e-boeklezer

Meer e-boeken van dezelfde auteur (s) / Editor

20.915 E-boeken in deze categorie