Cheryl Geoffrion & Erik Peterson 
Three Value Conversations: How to Create, Elevate, and Capture Customer Value at Every Stage of the Long-Lead Sale [EPUB ebook] 

Ondersteuning

The three conversations B2B sale pros must have with customers to control every step of long lead buying cycle The Three Value Conversations provides the tools and methods you need to differentiate you and your solution from the competition, elevate value to the right decision maker, and maximize all sales opportunities across the entire long lead buying cycle.Based on extensive research, the authors program enables salespeople to articulate value in three essential conversations with the customer: the Differentiation Conversation (creating value), the Justification Conversation (elevating the value to the right level of decision maker), and the Maximization Conversation (capturing that value and maximizing the size of your opportunities).

€46.13
Betalingsmethoden
Koop dit e-boek en ontvang er nog 1 GRATIS!
Taal Engels ● Formaat EPUB ● Pagina’s 256 ● ISBN 9780071849722 ● Uitgeverij McGraw-Hill Education ● Gepubliceerd 2015 ● Downloadbare 3 keer ● Valuta EUR ● ID 4843637 ● Kopieerbeveiliging Adobe DRM
Vereist een DRM-compatibele e-boeklezer

Meer e-boeken van dezelfde auteur (s) / Editor

260.259 E-boeken in deze categorie