Eva Kushner & Jean O’Grady 
The Critical Path and Other Writings on Critical Theory, 1963-1975 [PDF ebook] 

Ondersteuning

This volume, which collects Northrop Frye”s writings on the theory of literary criticism from the middle period of his career, includes one of Frye”s own favourites, The Critical Path (1971). A highly important marker of Frye”s career, The Critical Path openly addresses topics that he had previously been reluctant to discuss as fully, including the importance of literature to society, the responsibilities of critics, and the deeper rationales for studying literature.

Filled with insightful texts that indicate his transition from literary critic to a theorist of language, myth, and human culture, this edition helps to illuminate many of the ideas and arguments that would appear later in The Great Code and Words with Power. Accompanied by the rigorous scholarship for which the series is renowned, this is another valuable contribution to literary criticism and theory.

€132.24
Betalingsmethoden
Koop dit e-boek en ontvang er nog 1 GRATIS!
Formaat PDF ● Pagina’s 496 ● ISBN 9781442687783 ● Editor Eva Kushner & Jean O’Grady ● Uitgeverij University of Toronto Press, Scholarly Publishing Division ● Gepubliceerd 2009 ● Downloadbare 3 keer ● Valuta EUR ● ID 6571456 ● Kopieerbeveiliging Adobe DRM
Vereist een DRM-compatibele e-boeklezer

Meer e-boeken van dezelfde auteur (s) / Editor

67.668 E-boeken in deze categorie