Eva Kushner & Jean O’Grady 
The Critical Path and Other Writings on Critical Theory, 1963-1975 [PDF ebook] 

Ajutor

This volume, which collects Northrop Frye”s writings on the theory of literary criticism from the middle period of his career, includes one of Frye”s own favourites, The Critical Path (1971). A highly important marker of Frye”s career, The Critical Path openly addresses topics that he had previously been reluctant to discuss as fully, including the importance of literature to society, the responsibilities of critics, and the deeper rationales for studying literature.

Filled with insightful texts that indicate his transition from literary critic to a theorist of language, myth, and human culture, this edition helps to illuminate many of the ideas and arguments that would appear later in The Great Code and Words with Power. Accompanied by the rigorous scholarship for which the series is renowned, this is another valuable contribution to literary criticism and theory.

€132.24
Metode de plata
Cumpărați această carte electronică și primiți încă 1 GRATUIT!
Format PDF ● Pagini 496 ● ISBN 9781442687783 ● Editor Eva Kushner & Jean O’Grady ● Editura University of Toronto Press, Scholarly Publishing Division ● Publicat 2009 ● Descărcabil 3 ori ● Valută EUR ● ID 6571456 ● Protecție împotriva copiilor Adobe DRM
Necesită un cititor de ebook capabil de DRM

Mai multe cărți electronice de la același autor (i) / Editor

67.668 Ebooks din această categorie