Eva Kushner & Jean O’Grady 
The Critical Path and Other Writings on Critical Theory, 1963-1975 [PDF ebook] 

支持

This volume, which collects Northrop Frye”s writings on the theory of literary criticism from the middle period of his career, includes one of Frye”s own favourites, The Critical Path (1971). A highly important marker of Frye”s career, The Critical Path openly addresses topics that he had previously been reluctant to discuss as fully, including the importance of literature to society, the responsibilities of critics, and the deeper rationales for studying literature.

Filled with insightful texts that indicate his transition from literary critic to a theorist of language, myth, and human culture, this edition helps to illuminate many of the ideas and arguments that would appear later in The Great Code and Words with Power. Accompanied by the rigorous scholarship for which the series is renowned, this is another valuable contribution to literary criticism and theory.

€132.24
支付方式
购买此电子书可免费获赠一本!
格式 PDF ● 网页 496 ● ISBN 9781442687783 ● 编辑 Eva Kushner & Jean O’Grady ● 出版者 University of Toronto Press, Scholarly Publishing Division ● 发布时间 2009 ● 下载 3 时 ● 货币 EUR ● ID 6571456 ● 复制保护 Adobe DRM
需要具备DRM功能的电子书阅读器

来自同一作者的更多电子书 / 编辑

67,668 此类电子书