Bert Bielefeld 
Basics Construction Scheduling [EPUB ebook] 

Soporte

In a world of tight time frames and highly interdependent processes, scheduling is an indispensable prerequisite for successful project implementation. It is the duty of the architect to manage all the project participants in a goal-oriented manner and to call for their results when the time is right. For this reason, a systematic schedule of target dates, adapted to a project’s sequences and workflows, is a necessary tool for the day-to-day management and monitoring of complex construction projects.
Topics:


  • Organizing the planning and construction process

  • The basics of scheduling

  • Goal-oriented presentation formats and levels of detail

  • Developing a schedule

  • Using schedules in the real world

€22.00
Métodos de pago

Tabla de materias

Table of Contents:

Foreword

Introduction

Organizing the Planning and Construction Process

Coordinating Schedule Development

Coordinating the Pre-Implementation Phase

Coordinating the Construction Process

Preparing a Schedule

Components of a Schedule

Presentation Formats

Levels of Detail

Preparing an Overall Schedule

Structure of a Project-Oriented Schedule

The Participant’s Activities

Scheduling Activity Durations

Scheduling Workflows

Working with a Schedule

Updating and Maintaining a Schedule

Usability in the Everyday Work Environment

Disruptions to the Construction Process

Making Up for Disruptions

Scheduling as Documentation of the Process

Closing Remarks

Appendix

Sobre el autor

Dr.-Ing. Bert Bielefeld ist praktizierender Architekt und Inhaber des Architekturbüros bertbielefeld architekten.

¡Compre este libro electrónico y obtenga 1 más GRATIS!
Idioma Inglés ● Formato EPUB ● Páginas 83 ● ISBN 9783035613193 ● Tamaño de archivo 12.0 MB ● Editorial Birkhäuser ● Ciudad Basel/Berlin/Boston ● Publicado 2017 ● Edición 1 ● Descargable 24 meses ● Divisa EUR ● ID 6644349 ● Protección de copia Adobe DRM
Requiere lector de ebook con capacidad DRM

Más ebooks del mismo autor / Editor

21.363 Ebooks en esta categoría