Bert Bielefeld 
Basics Construction Scheduling [EPUB ebook] 

Ủng hộ

In a world of tight time frames and highly interdependent processes, scheduling is an indispensable prerequisite for successful project implementation. It is the duty of the architect to manage all the project participants in a goal-oriented manner and to call for their results when the time is right. For this reason, a systematic schedule of target dates, adapted to a project’s sequences and workflows, is a necessary tool for the day-to-day management and monitoring of complex construction projects.
Topics:


  • Organizing the planning and construction process

  • The basics of scheduling

  • Goal-oriented presentation formats and levels of detail

  • Developing a schedule

  • Using schedules in the real world

€22.00
phương thức thanh toán

Mục lục

Table of Contents:

Foreword

Introduction

Organizing the Planning and Construction Process

Coordinating Schedule Development

Coordinating the Pre-Implementation Phase

Coordinating the Construction Process

Preparing a Schedule

Components of a Schedule

Presentation Formats

Levels of Detail

Preparing an Overall Schedule

Structure of a Project-Oriented Schedule

The Participant’s Activities

Scheduling Activity Durations

Scheduling Workflows

Working with a Schedule

Updating and Maintaining a Schedule

Usability in the Everyday Work Environment

Disruptions to the Construction Process

Making Up for Disruptions

Scheduling as Documentation of the Process

Closing Remarks

Appendix

Giới thiệu về tác giả

Dr.-Ing. Bert Bielefeld ist praktizierender Architekt und Inhaber des Architekturbüros bertbielefeld architekten.

Mua cuốn sách điện tử này và nhận thêm 1 cuốn MIỄN PHÍ!
Ngôn ngữ Anh ● định dạng EPUB ● Trang 83 ● ISBN 9783035613193 ● Kích thước tập tin 12.0 MB ● Nhà xuất bản Birkhäuser ● Thành phố Basel/Berlin/Boston ● Được phát hành 2017 ● Phiên bản 1 ● Có thể tải xuống 24 tháng ● Tiền tệ EUR ● TÔI 6644349 ● Sao chép bảo vệ Adobe DRM
Yêu cầu trình đọc ebook có khả năng DRM

Thêm sách điện tử từ cùng một tác giả / Biên tập viên

21.363 Ebooks trong thể loại này