Bert Bielefeld 
Basics Construction Scheduling [EPUB ebook] 

Support

In a world of tight time frames and highly interdependent processes, scheduling is an indispensable prerequisite for successful project implementation. It is the duty of the architect to manage all the project participants in a goal-oriented manner and to call for their results when the time is right. For this reason, a systematic schedule of target dates, adapted to a project’s sequences and workflows, is a necessary tool for the day-to-day management and monitoring of complex construction projects.
Topics:


  • Organizing the planning and construction process

  • The basics of scheduling

  • Goal-oriented presentation formats and levels of detail

  • Developing a schedule

  • Using schedules in the real world

€22.00
méthodes de payement

Table des matières

Table of Contents:

Foreword

Introduction

Organizing the Planning and Construction Process

Coordinating Schedule Development

Coordinating the Pre-Implementation Phase

Coordinating the Construction Process

Preparing a Schedule

Components of a Schedule

Presentation Formats

Levels of Detail

Preparing an Overall Schedule

Structure of a Project-Oriented Schedule

The Participant’s Activities

Scheduling Activity Durations

Scheduling Workflows

Working with a Schedule

Updating and Maintaining a Schedule

Usability in the Everyday Work Environment

Disruptions to the Construction Process

Making Up for Disruptions

Scheduling as Documentation of the Process

Closing Remarks

Appendix

A propos de l’auteur

Dr.-Ing. Bert Bielefeld ist praktizierender Architekt und Inhaber des Architekturbüros bertbielefeld architekten.

Achetez cet ebook et obtenez-en 1 de plus GRATUITEMENT !
Langue Anglais ● Format EPUB ● Pages 83 ● ISBN 9783035613193 ● Taille du fichier 12.0 MB ● Maison d’édition Birkhäuser ● Lieu Basel/Berlin/Boston ● Publié 2017 ● Édition 1 ● Téléchargeable 24 mois ● Devise EUR ● ID 6644349 ● Protection contre la copie Adobe DRM
Nécessite un lecteur de livre électronique compatible DRM

Plus d’ebooks du même auteur(s) / Éditeur

21 363 Ebooks dans cette catégorie