Bert Bielefeld 
Basics Construction Scheduling [EPUB ebook] 

Ondersteuning

In a world of tight time frames and highly interdependent processes, scheduling is an indispensable prerequisite for successful project implementation. It is the duty of the architect to manage all the project participants in a goal-oriented manner and to call for their results when the time is right. For this reason, a systematic schedule of target dates, adapted to a project’s sequences and workflows, is a necessary tool for the day-to-day management and monitoring of complex construction projects.
Topics:


  • Organizing the planning and construction process

  • The basics of scheduling

  • Goal-oriented presentation formats and levels of detail

  • Developing a schedule

  • Using schedules in the real world

€22.00
Betalingsmethoden

Inhoudsopgave

Table of Contents:

Foreword

Introduction

Organizing the Planning and Construction Process

Coordinating Schedule Development

Coordinating the Pre-Implementation Phase

Coordinating the Construction Process

Preparing a Schedule

Components of a Schedule

Presentation Formats

Levels of Detail

Preparing an Overall Schedule

Structure of a Project-Oriented Schedule

The Participant’s Activities

Scheduling Activity Durations

Scheduling Workflows

Working with a Schedule

Updating and Maintaining a Schedule

Usability in the Everyday Work Environment

Disruptions to the Construction Process

Making Up for Disruptions

Scheduling as Documentation of the Process

Closing Remarks

Appendix

Over de auteur

Dr.-Ing. Bert Bielefeld ist praktizierender Architekt und Inhaber des Architekturbüros bertbielefeld architekten.

Koop dit e-boek en ontvang er nog 1 GRATIS!
Taal Engels ● Formaat EPUB ● Pagina’s 83 ● ISBN 9783035613193 ● Bestandsgrootte 12.0 MB ● Uitgeverij Birkhäuser ● Stad Basel/Berlin/Boston ● Gepubliceerd 2017 ● Editie 1 ● Downloadbare 24 maanden ● Valuta EUR ● ID 6644349 ● Kopieerbeveiliging Adobe DRM
Vereist een DRM-compatibele e-boeklezer

Meer e-boeken van dezelfde auteur (s) / Editor

21.363 E-boeken in deze categorie